Check us out in Concrete magazine

Check us out in Concrete magazine

De-risking Bond Street Station Upgrade: Principal Engineer Ben Ablett of Alan Auld Engineering has authored an article in The Concrete Society’s Concrete magazine (Volume 49, March 2015, Issue 2) discussing the adopted temporary works sequencing and the staged analysis approach that was undertaken using Oasys software. Well worth a read!

A link to the file can be found here: Concrete Magazine Article.

Share via:

Comments are closed.